New dispositions

Dso Information Report Project Omimum-Observability Measure Plants >1 Megawatt.

With Resolution 540/2021/R/eel, ARERA defined the responsibilities for the development and maintenance of the technological solutions necessary for data exchange between Terna (TSO), distribution companies (DSO) and electricity production plants with a capacity equal to or greater than 1 MW (SGU Significant Grid User) connected or to be connected to the Medium Voltage grids for the safe operation of the national electricity system, the timing of implementation of data exchange and the necessary adjustments by producers, and the methods for covering costs. Read more